COMPENSATION TRADE CONTRACT

更新时间:2019-09-08 19:02 找法网官方整理
导读:
ContractNo.:__________DateofSigning:_________PlaceofSigning:_______ThetwoParties:PartyA:________________________________Address:________________________________Tel:_________________Fax:_______________E-mail:____________________

  Contract No.: __________

  Date of Signing: _________

  Place of Signing: _______

  The two Parties:

  Party A: ________________________________

  Address: ________________________________

  Tel:_________________Fax: _______________

  E-mail: _________________________________

  Party B: ________________________________

  Address: _______________________________

  Tel:_________________Fax: ________________

  E-mail:_________________________________

  WITNESSETH

  Whereas Party B has machines and equipment, which are now used in Party B\'s manufacturing of _______, and is willing to sell to Party A the machines and equipment; and

  Whereas Party B agrees to buy the products, _______, made by Party A using the machines and equipment Party B supplies, in compensation for the price of the machines and equipment, and

  Whereas Party A agrees to purchase from Party B the machines and equipment, and

  Whereas Party A agrees to sell to Party B the products, _______, in compensation of the price of Party B\'s machines and equipment; Now therefore, in consideration of the premises and covenants described hereinafter, Party A and Party B agree a follows:

  ARTICLE 1 TRANSACTIONS

  A) Party B agrees to provide Party A with _________ machines to be used in production, their auxiliary machinery, accessories and spare parts and a variety of measuring and testing instruments required in the process of production. The details of the models, names, specifications,quantity, prices, packing, delivery , etc. thereof shall be specified in an additional equipment-import agreement to be concluded by and between both parties which shall serve as an component part hereof.

  B) The total value of the machines, auxiliary equipment, etc. supplied by part B shall be paid off by Party A with part of the manufactures made therewith and/or other goods, or with(designate name)products made in (Name of the plant)if both parties agree. The specific name(s), quantity, price, delivery, etc. of the goods granted as the make-up payment shall be decided in an additional compensation goods-supply agreement made by the parties which shall serve as a component part hereof. The equipment-import agreement and compensation-goods-supply agreement aforesaid may be merged as one called sales agreement on compensation trade(See appendix).

  ARTICLE 2 PAYMENT

  Both parties agree to open letters of credit in favor of each other, i.e. Party A will open, at regular intervals, long term letters of credit in favor of Party B to pay by installments the total cost of the machines and auxiliary equipment provided by Party B; whereas Party B will open sight letters of credit in favor of Party A to pay the products to be delivered by Party A. Party A shall pay for the total cost of the machines and auxiliary equipment with the money remitted by Party B as reimbursement for the products to be delivered by Party A. In case the sum to be paid by Party B fails to cover the value of the long-term letters of credit opened by Party A, the difference shall be made up by Party B by paying that much to Party A in advance, before the long-term letters of credit are due, to enable Party A to reimburse on time the long-term letters of credit it opens. The payment of the long-term letters of credit opened by Party A is based on Party B\'s opening a sight letter of credit under the provisions and on its paying the advance required herein. Thus, Party B warrants, guarantees and covenants that it will open the letters of credit and pay the advance as provided herein.

  ARTICLE 3 REIMBURSEMENT

  Party A shall reimburse Party B for all the machines and auxiliary equipment supplied by Party B by delivering goods to Party B on a monthly basis and the reimbursement will last for___ year(s) and ____months(s). The reimbursement shall start approximately ____month(s) after the first delivery of the machines and, in principle, the money to be reimbursed per month shall be ______percent of the total amount due for the machines. With a ______month(s) notice to Party B, Party A may reimburse Party B in advance.

  Within the reimbursement period, Party B shall, under the provisions of the additional sales agreement aforesaid, open, sight, irrevocable, divisible and assignable letters of credit, covering the full amount, in favor of Party A.

  ARTICLE 4 STANDARD MONEY AND PRICE STANDARD

  The standard money for this transaction is (Name of currency). All the machinery, auxiliary equipment and measuring and testing instruments , etc. provided by Party B shall be valued with (Name of currency), while the goods provided by Party A to Party B as reimbursement shall be valued with the basis price (Name of currency) of the same goods exported by Party A at the time when this agreement is entered into, and the total price (Name of currency) shall be changed into that of (Name of currency) in accordance with the exchange rate then.[page]

  ARTICLE 5 INTREREST

  Party A shall pay the interest on its long-term letters of credit and the interest on the cash in advance rendered by Party B. The annual interest rate is agreed upon at_____%.

  ARTICLE 6 TECHNICAL SERVICE

  The machinery, after arrival at its destination, shall be installed by Party A, Party B shall dispatch its technicians to render spot instructions and other necessary technical assistance during the installation of the main machines, as may be requested by Party A in case of necessity, Party B shall be liable for the losses resulted in such a course of installation from technical default on its part.

  ARTICLE 7 ADDITIONAL EQUIPMENT

  During the enforcement of this agreement, if it is found necessary that, in addition to the machinery and equipment listed herein, some new accessories or measuring and testing instruments are needed for completion of the project, (an) additional order(s) may be made through negotiation by the parties. The new items thus added shall be incorporated in agreement.

  ARTICLE 8 INSURANCE

  The machinery and auxiliary equipment, after shipment, shall be insured by Party B. The title thereof shall be transferred into Party B after full payment therefore is made by Party B, thereafter, the unforeseeable losses concerning the machinery and auxiliary equipment shall be indemnified for first by the Insurance Company to Party B, then Party B shall remit for Party A,in proportion, the sum already paid by Party A for the machinery or equipment involved in the contingency.

  ARTICLE 9 LIABILITY FOR BREACH OF AGREEMENT

  Party B shall , if it fails to comply with this agreement to make purchase of the goods delivered by Party A as reimbursement, or Party A shall, if it fails to comply with this agreement to deliver the goods it is due to provide, be deemed liable for a breach of agreement and shall compensate the non-breaching Party for the loss caused thereupon and shall pay the non-breaching Party a fine accounting for % of the total value of the goods in question.

  ARTICLE 10 PERFORMANCE GUARANTEE

  To guarantee the implementation of this agreement, each party shall submit to the other party a letter of guarantee issued by its bank respectively. The guaranteeing bank of Party A is ______ Bank, ______, while the guaranteeing bank of Party B is ______Bank, ______.

  ARTICLE 11 AMENDMNET

  The modification of this agreement in particular cases shall be agreed upon by both parties through negotiations.

  ARTICLE 12 Force Majeure

  In case that one or both parties are impossible to perform the duties provided herein on account of force majeure, the party (or parties) in contingency shall inform the other party (or each other) of the case immediately and may, provided the case is duly verified by the competent authorities, delay in performance of or not perform the relevant duties hereunder the be partially or entirely exempted from the liability for breach of this agreement.

  ARTICLE 13 ARBITRATION

  Any dispute arising from or in connection with this Contract shall be submitted to China International Economic and Trade Arbitration Commission,Shenzhen Commission for arbitration which shall be conducted in accordance with the Commission\'s arbitration rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties and the applicable law is the material law of P.R.C.

  Notwithstanding any reference to arbitration, both Parties shall continue to perform their respective obligations under the Contract unless otherwise agreed.

  ARTICLE LANGUAGE AND EFFECTIVE DATE

  There are two originals hereof made respectively in Chinese and ______, both of which are of the same effect.

  This agreement shall come into effect on the date when both parties set their hands hereunto and remain effective for_____ years. Upon its expiration, the parties may, if they choose, extend the term hereof for _____years or execute a new cooperation agreement, provided they apply to and approved by the Authority agencies concerned.

  Party A        Party B

  Representative of___ Representative of____

  (Authorized Signature)___ (Authorized Signature)

温馨提示:法律问题具有较强的专业性,如有疑问,建议一对一咨询专业律师
我在合同纠纷领域有丰富的实战经验 ,如果你需要针对性解答,可以向我在线咨询。
响应时间 平均2分钟内
已帮助 154078
在线咨询
声明:该作品系作者结合法律法规、政府官网及互联网相关知识整合,如若内容错误请通过【投诉】功能联系删除。
相关知识推荐
您不能在没有事故鉴定的情况下申请代位求偿权吗?
你是因为什么原因要申请代为赔偿呢?是你垫付了相关费用吗
找法网咨询助手
官方
当前在线
立即咨询
找法网咨询助手提醒您:
法律所涉问题复杂,每个细节都有可能决定案件走向,若问题紧急,建议 立即咨询 律师,并详细描述自身问题,以获得 针对性解答。24小时在线,平均5分钟回复。
PURCHASE CONTRACT
PURCHASE CONTRACT
英文合同
国徽悬挂在哪些国家机关和地方?
悬挂国徽的国家机关和场所如下:1、县级以上各级人民代表大会常务委员会;2、县级以上各级人民政府;3、中央军委;4、各级人民法院和专门人民法院;5、各级人民检察院
公司签的合作合同由于被酒吧客人吃豆腐接受不了想辞职现在公司告知需要赔偿培训费用?
1、辞职被要求赔偿培训费的处理是,如果是违反劳动合同,要赔偿培训费。在合同期内辞职,而且参加过公司组织的培训,必须在公司服务多少年的,而且按服务年限来分摊培训费
吉安征地可以怎样计算补偿
征地补偿是:对被征地的农村集体经济组织造成的经济损失支付补偿;对被征用土地上的青苗因征地受到毁损,向种植该青苗的单位和个人支付补偿;对被征用土地上的附着物,如房
来宾法律咨询多少钱费用
法律分析:一般在1000元每小时左右,律师的咨询费用收取需要根据当地的物价水平和政府的指导规定能进行确定。每个地方的收费标准不一样,具体要看律师事务所的收费标准
签了一年的合同,因为现在工作原因想提前退租,下个月到期的,想问下能不能退押金这些
法律分析:一般情况下中途退租的,不退押金,具体看租赁合同是如何约定的法律依据:《中华人民共和国民法典》第五条民事主体从事民事活动,应当遵循自愿原则,按照自己的意
1分钟提问 海量律师提供在线解答
  • 1
    提交咨询
    详细描述您所遇到的问题或纠纷并发送
  • 2
    接入律师
    耐心等待律师解答,平均5分钟及时响应
  • 3
    获取解答
    还有疑问?60分钟无限次追问
立即咨询